Pictures of the Week August 30, 2003
This week's progress is with the Bosch CIS fuel injection system. I have found a configuration that will fit all of the components under the cowl. Work continues on the fuel injection system installation.
A brief design session on the white board led to the layout of the air flow
sensor mounting flange.
The layout was transferred to a piece of .080 6061 aluminum.
How to make a 3" to 1 7/8" diffuser for the airflow sensor outlet from
a piece of 3" aluminum tubing.
September 1, 2003
fabrication of air flow sensor bottom cover
welding of air flow sensor bottom cover
Click on the pictures for a full sized photo.